Energy data sheet

Find a store

Everything Mary EVM14467-1 Quilted Black Collapsible Rolling Sewing Machine Case 71 x 35 x 36cm

0863158
£190.00
£190.00
Delivery
Hurry, 3 left!
Click & Collect Unavailable
Online exclusive items are only available for home delivery
View stock levels at a store nearby

Product Information

  • Quilted polyester design offers style
  • 5 wheels with 360-degree rotation ensure easy manoeuvrability
  • Zip down front panel provides quick access
Stand out on the move with the Everything Mary EVM14467-1 Quilted Black Collapsible Rolling Sewing Machine Case 71 x 35 x 36cm that combines collapsible convenience, generous space and smooth-rolling wheels for easy organisation and transport of sewing machines, craft supplies or travel essentials. You'll find the zip down front panel gives quick access to your machine, a stabilising strap keeps everything secure, and the innovative collapsible design makes it simple to store away when not in use.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
36.8 x 71.1 x 35.6cm
Customer Assembly Required:
No
Height:
36.8
Material:
Metal,Plastic,Fabric,Cardboard
Width:
71.1
Depth:
35.6
Model No:
EVM14467-1
Product Code:
0863158

Returns information

Return this product for free within 14 days and we'll gladly refund or exchange it for you. This product cannot be returned in store but we can organise a collection for you.

View full returns policy

Shipped by the supplier

This product is only available online and sent directly to you from our supplier’s warehouse.

Delivery timescales may vary and will be accurately shown at checkout after entering your address.

Some postcode restrictions may apply, which can be found in the product information or after entering your address at checkout.

Our 14-day free returns policy applies to products shipped by our supplier but they cannot be returned in store.

Ideas & Advice

Ideas and Advice - Let's do it together

Loads of tips, hacks and how-tos to help you get your jobs done

Visit Ideas & Advice »

Product Information

  • Quilted polyester design offers style
  • 5 wheels with 360-degree rotation ensure easy manoeuvrability
  • Zip down front panel provides quick access
Stand out on the move with the Everything Mary EVM14467-1 Quilted Black Collapsible Rolling Sewing Machine Case 71 x 35 x 36cm that combines collapsible convenience, generous space and smooth-rolling wheels for easy organisation and transport of sewing machines, craft supplies or travel essentials. You'll find the zip down front panel gives quick access to your machine, a stabilising strap keeps everything secure, and the innovative collapsible design makes it simple to store away when not in use.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
36.8 x 71.1 x 35.6cm
Customer Assembly Required:
No
Height:
36.8
Material:
Metal,Plastic,Fabric,Cardboard
Width:
71.1
Depth:
35.6
Model No:
EVM14467-1
Product Code:
0863158

You May Also Like

No Reviews Yet

Item removed from saved for later

Quick guide to pre-ordering