Energy data sheet

Find a store

Everything Mary EVM14466-2 Quilted Purple Collapsing Rolling Sewing Machine Case 54 x 33 x 38cm

0863156
£145.00
£145.00
Delivery
Out of stock
Click & Collect Unavailable
Online exclusive items are only available for home delivery
View stock levels at a store nearby

Product Information

  • Polyester material ensures lasting everyday use
  • Spacious interior with multiple pockets
  • 360 degree wheels and lockable handle
Set off on creative journeys with the Everything Mary EVM14466-2 Quilted Purple Collapsing Rolling Sewing Machine Case 54 x 33 x 38cm that makes transporting large machines and supplies effortless, thanks to a quilted finish and smooth-rolling four-wheel design. Spacious interior compartments let you organise threads, fabrics and tools, while reinforced polyester construction and a stabilising strap help keep your machine secure and protected. Zip down the front panel for quick access, enjoy the comfort of ergonomic handles and easily store the case away when not in use due to its innovative collapsible design.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
38.1 x 54.6 x 33cm
Customer Assembly Required:
No
Height:
38.1
Material:
Metal,Plastic,Fabric,Cardboard
Width:
54.6
Depth:
33
Model No:
EVM14466-2
Product Code:
0863156

Returns information

Return this product for free within 14 days and we'll gladly refund or exchange it for you. This product cannot be returned in store but we can organise a collection for you.

View full returns policy

Shipped by the supplier

This product is only available online and sent directly to you from our supplier’s warehouse.

Delivery timescales may vary and will be accurately shown at checkout after entering your address.

Some postcode restrictions may apply, which can be found in the product information or after entering your address at checkout.

Our 14-day free returns policy applies to products shipped by our supplier but they cannot be returned in store.

Ideas & Advice

Ideas and Advice - Let's do it together

Loads of tips, hacks and how-tos to help you get your jobs done

Visit Ideas & Advice »

Product Information

  • Polyester material ensures lasting everyday use
  • Spacious interior with multiple pockets
  • 360 degree wheels and lockable handle
Set off on creative journeys with the Everything Mary EVM14466-2 Quilted Purple Collapsing Rolling Sewing Machine Case 54 x 33 x 38cm that makes transporting large machines and supplies effortless, thanks to a quilted finish and smooth-rolling four-wheel design. Spacious interior compartments let you organise threads, fabrics and tools, while reinforced polyester construction and a stabilising strap help keep your machine secure and protected. Zip down the front panel for quick access, enjoy the comfort of ergonomic handles and easily store the case away when not in use due to its innovative collapsible design.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
38.1 x 54.6 x 33cm
Customer Assembly Required:
No
Height:
38.1
Material:
Metal,Plastic,Fabric,Cardboard
Width:
54.6
Depth:
33
Model No:
EVM14466-2
Product Code:
0863156

No Reviews Yet

Item removed from saved for later

Quick guide to pre-ordering