Energy data sheet

Find a store

Everything Mary EVM14466-1 Quilted Black Collapsing Rolling Sewing Machine Case 54 x 33 x 38cm

0863155
£145.00
£145.00
Delivery
Hurry, 1 left!
Click & Collect Unavailable
Online exclusive items are only available for home delivery
View stock levels at a store nearby

Product Information

  • Collapsible design allows compact storage when not in use
  • Polyester material ensures lasting everyday use
  • 360 degree wheels allow easy movement and transport
Take creative journeys further with the Everything Mary EVM14466-1 Quilted Black Collapsing Rolling Sewing Machine Case 54 x 33 x 38cm that combines robust polyester construction with clever organisation and effortless portability, letting you store and transport your machine and supplies with total ease. Spacious interior compartments hold threads, fabric and tools securely while a stabilising strap keeps your machine safe on the move. Four 360-degree wheels and a lockable handle ensure smooth rolling wherever inspiration takes you, and the innovative collapsible design means tidy storage when not in use.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
38.1 x 54.6 x 33cm
Customer Assembly Required:
No
Height:
38.1
Material:
Metal,Plastic,Fabric,Cardboard
Width:
54.6
Depth:
33
Model No:
EVM14466-1
Product Code:
0863155

Returns information

Return this product for free within 14 days and we'll gladly refund or exchange it for you. This product cannot be returned in store but we can organise a collection for you.

View full returns policy

Shipped by the supplier

This product is only available online and sent directly to you from our supplier’s warehouse.

Delivery timescales may vary and will be accurately shown at checkout after entering your address.

Some postcode restrictions may apply, which can be found in the product information or after entering your address at checkout.

Our 14-day free returns policy applies to products shipped by our supplier but they cannot be returned in store.

Ideas & Advice

Ideas and Advice - Let's do it together

Loads of tips, hacks and how-tos to help you get your jobs done

Visit Ideas & Advice »

Product Information

  • Collapsible design allows compact storage when not in use
  • Polyester material ensures lasting everyday use
  • 360 degree wheels allow easy movement and transport
Take creative journeys further with the Everything Mary EVM14466-1 Quilted Black Collapsing Rolling Sewing Machine Case 54 x 33 x 38cm that combines robust polyester construction with clever organisation and effortless portability, letting you store and transport your machine and supplies with total ease. Spacious interior compartments hold threads, fabric and tools securely while a stabilising strap keeps your machine safe on the move. Four 360-degree wheels and a lockable handle ensure smooth rolling wherever inspiration takes you, and the innovative collapsible design means tidy storage when not in use.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
38.1 x 54.6 x 33cm
Customer Assembly Required:
No
Height:
38.1
Material:
Metal,Plastic,Fabric,Cardboard
Width:
54.6
Depth:
33
Model No:
EVM14466-1
Product Code:
0863155

You May Also Like

No Reviews Yet

Item removed from saved for later

Quick guide to pre-ordering