Energy data sheet

Find a store

Everything Mary EVM14451-1 Jumbo Floral Collapsible Rolling Sewing Machine Case 71 x 35 x 36cm

0863154
£190.00
£190.00
Delivery
19  in stock
Click & Collect Unavailable
Online exclusive items are only available for home delivery
View stock levels at a store nearby

Product Information

  • Collapsible design allows compact storage when not in use
  • 5 wheels with 360-degree rotation ensure easy manoeuvrability
  • Zip-down front panel provides quick machine access
Turn every journey into an organised adventure with the Everything Mary EVM14451-1 Jumbo Floral Collapsible Rolling Sewing Machine Case 71 x 35 x 36cm, bringing together a vibrant design and spacious compartments for effortless storage and travel. The roomy interior fits fabric, craft essentials or professional tools, while the zip-down front panel means you'll always have quick access to your machine. Five smooth-rolling wheels with 360-degree rotation and a lockable retractable handle make moving from home to class or retreat a breeze, and the innovative collapsible frame lets you tuck it away neatly when not in use.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
36.8 x 71.1 x 35.6cm
Customer Assembly Required:
No
Height:
36.8
Material:
Metal,Plastic,Fabric,Cardboard
Width:
71.1
Depth:
35.6
Model No:
EVM14451-1
Product Code:
0863154

Returns information

Return this product for free within 14 days and we'll gladly refund or exchange it for you. This product cannot be returned in store but we can organise a collection for you.

View full returns policy

Shipped by the supplier

This product is only available online and sent directly to you from our supplier’s warehouse.

Delivery timescales may vary and will be accurately shown at checkout after entering your address.

Some postcode restrictions may apply, which can be found in the product information or after entering your address at checkout.

Our 14-day free returns policy applies to products shipped by our supplier but they cannot be returned in store.

Ideas & Advice

Ideas and Advice - Let's do it together

Loads of tips, hacks and how-tos to help you get your jobs done

Visit Ideas & Advice »

Product Information

  • Collapsible design allows compact storage when not in use
  • 5 wheels with 360-degree rotation ensure easy manoeuvrability
  • Zip-down front panel provides quick machine access
Turn every journey into an organised adventure with the Everything Mary EVM14451-1 Jumbo Floral Collapsible Rolling Sewing Machine Case 71 x 35 x 36cm, bringing together a vibrant design and spacious compartments for effortless storage and travel. The roomy interior fits fabric, craft essentials or professional tools, while the zip-down front panel means you'll always have quick access to your machine. Five smooth-rolling wheels with 360-degree rotation and a lockable retractable handle make moving from home to class or retreat a breeze, and the innovative collapsible frame lets you tuck it away neatly when not in use.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
36.8 x 71.1 x 35.6cm
Customer Assembly Required:
No
Height:
36.8
Material:
Metal,Plastic,Fabric,Cardboard
Width:
71.1
Depth:
35.6
Model No:
EVM14451-1
Product Code:
0863154

You May Also Like

No Reviews Yet

Item removed from saved for later

Quick guide to pre-ordering