Energy data sheet

Find a store

Everything Mary EVM14448-4 Black Floral Collapsible Rolling Sewing Machine Case 54 x 33 x 38cm

0863153
£145.00
£145.00
Delivery
8  in stock
Click & Collect Unavailable
Online exclusive items are only available for home delivery
View stock levels at a store nearby

Product Information

  • Polyester material ensures lasting everyday use
  • 360 degree wheels allow easy movement and transport
  • Zip down front panel provides quick access
Take creativity on the move with this Everything Mary EVM14448-4 Black Floral Collapsible Rolling Sewing Machine Case 54 x 33 x 38cm, designed to keep your machine and supplies secure, organised and effortlessly portable. Crafted from durable polyester with reinforced stitching, it features a spacious main compartment, multiple pockets for accessories and a patent-pending collapsible design for easy storage. Four smooth-rolling wheels with 360 degree rotation and a lockable handle ensure smooth transport, while a stabilising strap and zip down front panel offer easy access and added security for your machine. Perfect for classes, retreats or travel, this case helps keep everything in place so you can focus on your next project.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
38.1 x 54.6 x 33cm
Customer Assembly Required:
No
Height:
38.1
Material:
Metal,Plastic,Fabric,Cardboard
Width:
54.6
Depth:
33
Model No:
EVM14448-4
Product Code:
0863153

Returns information

Return this product for free within 14 days and we'll gladly refund or exchange it for you. This product cannot be returned in store but we can organise a collection for you.

View full returns policy

Shipped by the supplier

This product is only available online and sent directly to you from our supplier’s warehouse.

Delivery timescales may vary and will be accurately shown at checkout after entering your address.

Some postcode restrictions may apply, which can be found in the product information or after entering your address at checkout.

Our 14-day free returns policy applies to products shipped by our supplier but they cannot be returned in store.

Ideas & Advice

Ideas and Advice - Let's do it together

Loads of tips, hacks and how-tos to help you get your jobs done

Visit Ideas & Advice »

Product Information

  • Polyester material ensures lasting everyday use
  • 360 degree wheels allow easy movement and transport
  • Zip down front panel provides quick access
Take creativity on the move with this Everything Mary EVM14448-4 Black Floral Collapsible Rolling Sewing Machine Case 54 x 33 x 38cm, designed to keep your machine and supplies secure, organised and effortlessly portable. Crafted from durable polyester with reinforced stitching, it features a spacious main compartment, multiple pockets for accessories and a patent-pending collapsible design for easy storage. Four smooth-rolling wheels with 360 degree rotation and a lockable handle ensure smooth transport, while a stabilising strap and zip down front panel offer easy access and added security for your machine. Perfect for classes, retreats or travel, this case helps keep everything in place so you can focus on your next project.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
38.1 x 54.6 x 33cm
Customer Assembly Required:
No
Height:
38.1
Material:
Metal,Plastic,Fabric,Cardboard
Width:
54.6
Depth:
33
Model No:
EVM14448-4
Product Code:
0863153

You May Also Like

No Reviews Yet

Item removed from saved for later

Quick guide to pre-ordering