- Spacious polyester interior fits sewing machines and crafting supplies
- Collapsible design allows compact storage when not in use
- 360-degree wheels ensure smooth and easy mobility
Take creative adventures anywhere with the Everything Mary EVM12775-2 Quilted Black Collapsible Rolling Sewing Machine Case 55.8 x 34.3 x 45cm that combines generous storage, smart organisation and effortless mobility for all your crafting essentials. Crafted from durable polyester, the trolley features a spacious interior to fit sewing machines and supplies, multiple exterior pockets for accessories, a stabilising interior strap for security, and smooth-rolling four-wheel design with a telescopic handle for easy transport. The zip-down front panel gives quick access to your machine, while the collapsible structure folds flat for space-saving storage when not in use, making it a versatile companion for workshops, classes or home crafting.
-
Brand:
-
Everything Mary
-
Type:
-
Sewing Machine Trolleys
-
Pack Qty:
-
1
-
Size:
-
35.6 x 26.7 x 49.5cm
-
Customer Assembly Required:
-
No
-
Height:
-
35.6
-
Material:
-
Metal,Plastic,Fabric
-
Width:
-
26.7
-
Depth:
-
49.5
-
Model No:
-
EVM12775-2
-
Product Code:
-
0863180