Energy data sheet

Find a store

Everything Mary EVM12439-2 Black White Dot Sewing Machine Trolley Bag 42 x 24 x 34cm

0863123
£75.00
£75.00
Delivery
20+  in stock
Click & Collect Unavailable
Online exclusive items are only available for home delivery
View stock levels at a store nearby

Product Information

  • Collapsible design allows compact storage when not in use
  • Zip down front panel offers easy access to machine
  • Lockable handle and double wheels ensure effortless travel
Turn every sewing journey into a breeze with this Everything Mary EVM12439-2 Black White Dot Sewing Machine Trolley Bag 42 x 24 x 34cm that lets you travel confidently with your machine and accessories. Innovative collapsible design means you'll easily store it away when not in use, while the zip down front panel gives quick access and the stabilising strap keeps your machine secure on the go. Handy built-in pockets at the front and sides help keep threads, scissors and essentials organised, and the lockable handle with double rear wheels ensures smooth travel wherever your creativity takes you.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
34.3 x 24.1 x 41.9cm
Customer Assembly Required:
No
Height:
34.3
Material:
Metal,Plastic,Fabric,Cardboard
Width:
24.1
Depth:
41.9
Model No:
EVM12439-2
Product Code:
0863123

Returns information

Return this product for free within 14 days and we'll gladly refund or exchange it for you. This product cannot be returned in store but we can organise a collection for you.

View full returns policy

Shipped by the supplier

This product is only available online and sent directly to you from our supplier’s warehouse.

Delivery timescales may vary and will be accurately shown at checkout after entering your address.

Some postcode restrictions may apply, which can be found in the product information or after entering your address at checkout.

Our 14-day free returns policy applies to products shipped by our supplier but they cannot be returned in store.

Ideas & Advice

Ideas and Advice - Let's do it together

Loads of tips, hacks and how-tos to help you get your jobs done

Visit Ideas & Advice »

Product Information

  • Collapsible design allows compact storage when not in use
  • Zip down front panel offers easy access to machine
  • Lockable handle and double wheels ensure effortless travel
Turn every sewing journey into a breeze with this Everything Mary EVM12439-2 Black White Dot Sewing Machine Trolley Bag 42 x 24 x 34cm that lets you travel confidently with your machine and accessories. Innovative collapsible design means you'll easily store it away when not in use, while the zip down front panel gives quick access and the stabilising strap keeps your machine secure on the go. Handy built-in pockets at the front and sides help keep threads, scissors and essentials organised, and the lockable handle with double rear wheels ensures smooth travel wherever your creativity takes you.
Brand:
Everything Mary
Type:
Sewing Machine Trolleys
Pack Qty:
1
Size:
34.3 x 24.1 x 41.9cm
Customer Assembly Required:
No
Height:
34.3
Material:
Metal,Plastic,Fabric,Cardboard
Width:
24.1
Depth:
41.9
Model No:
EVM12439-2
Product Code:
0863123

You May Also Like

No Reviews Yet

Item removed from saved for later

Quick guide to pre-ordering